Yes, every granny flat needs a building permit
The 2024 changes made granny flats easier, but only on the planning side. The state's granny flat info sheet says you still need a building permit, and the granny flat must meet the National Construction Code. The City of Wanneroo and the City of Joondalup both say a building permit is always required.
Planning approval vs building permit
| Planning approval | Building permit | |
|---|---|---|
| Needed? | Usually not, if it meets the deemed-to-comply rules | Always |
| What it checks | Size (70 m²), setbacks, site cover, height, privacy | Structure, fire safety, energy, plumbing and the building code |
| Time limit | 60 days, or 90 with consultation | 10 business days (BA1) or 25 (BA2) |
If your granny flat needs planning approval, it must come first. Wanneroo says the planning approval must be granted before the building permit.
BA1 or BA2?
- BA2 (uncertified): the council checks the plans. Allowed for houses and Class 10 buildings, so a granny flat can use it. Decision within 25 business days.
- BA1 (certified): a private building surveyor checks the plans first and issues a Certificate of Design Compliance. Decision within 10 business days.
Wanneroo has separate BA1 and BA2 checklists for residential buildings.
Who can build it
The state says there are no special exemptions for prefab or kit homes. A habitable building worth more than $20,000 that needs a permit must be built by a registered builder or an approved owner-builder. Electrical and plumbing work must be done by licensed trades.
State fees
A BA2 costs 0.32% of the value and a BA1 0.19% (plus the surveyor), at least $121. The Building Services Levy is 0.137% above $45,000, and the Construction Training Fund levy is 0.2% for work over $100,000. Use the fee calculator on GetMyPermit to work it out.
Read the granny flat approval process, granny flat rules in WA, or City of Wanneroo granny flat rules.