Can you build one?
Yes. The Town of Victoria Park says you can build an ancillary dwelling (granny flat) with a single house, grouped dwelling or multiple dwelling, whatever the size of your land, as long as it meets the R-Codes rules for setbacks, site cover, height, privacy and access.
When you don't need planning approval
You don't need development approval if the granny flat meets all the deemed-to-comply rules and the property isn't heritage-protected. Every granny flat on a heritage-listed property, or in a heritage area, needs development approval.
The main rules for a granny flat with a house (R-Codes Volume 1, Part B):
- Same lot as a single house or grouped dwelling.
- No more than 70 m² inside (including built-in furniture, not counting a garage).
- Behind the street setback line.
- The main house still keeps its required open space and outdoor living area.
- All other R-Codes rules (privacy, boundary walls, setbacks) still apply.
Not sure? The Town offers a paid deemed-to-comply check that tells you if you need a development application.
Parking
| Where your lot is | Extra car bay for the granny flat |
|---|---|
| Location A: within 800 m walk of a high-frequency train station, or 250 m of a high-frequency bus stop | None |
| Location B: everywhere else | One extra bay on the lot |
The main house must keep its own parking too. Developments under Part C of the R-Codes don't need an extra bay.
Other things to know
- Who can live there: anyone. Family, friends or a tenant.
- Neighbours: you don't need their approval to apply. The Town may consult them if you ask to vary the rules.
- Timeframe: 60 days for a development application, or 90 if neighbours are consulted. Lodge online.
- Building permit: always needed, lodged with the Town.
- Rates: once it's finished, the Valuer-General reviews your property's rental value and the Town sends an updated rates notice.
- Services: you may need new meters or sub-meters for power, gas or water.
See the granny flat size calculator, granny flat parking rules and when no planning approval is needed.