Comparison

Transportable vs built-on-site granny flat

Short answer

The approvals are the same. Both need a building permit, both skip planning approval if they meet the rules (including 70 m² or less), and both need a registered builder if over $20,000. The real differences are how you pay, how it gets onto your block, and who's responsible for the finished building.

Last updated 6 November 2026

The approvals are the same

A lot of transportable and "DIY" granny flats are sold as if they skip the paperwork. They don't. In July 2026 Building and Energy and Consumer Protection warned that "DIY" and "permit-free" claims for prefabricated buildings may be misleading. There are no special exemptions for prefabricated buildings.

Transportable (built in a factory)Built on site
Planning approvalNot needed if it meets the deemed-to-comply rules, including 70 m² or lessSame
Building permitNeededNeeded
Registered builderNeeded if the permit is required and it's worth over $20,000 (unless you're an approved owner-builder)Same
Power and plumbingLicensed electrician and plumberSame
Where the work happensMostly in a factory, then delivered and installedOn your block
Site accessUsually needs room for a truck and often a craneNormal builder access

Where they really differ

Payments

Consumer Protection's advice for modular homes: pay only a small deposit, then make progress payments tied to real stages, such as delivery of materials, manufacturing stages and installation. Ask for proof that each stage is done before you pay, for example a visit to the factory.

Who's responsible

The builder named on the building permit is responsible for making sure the finished building meets the standards. With a transportable, make sure you know who that is: the factory, the installer, or both.

Getting it onto the block

A transportable has to be trucked in and placed. Check the route, driveway width, overhead power lines and trees before you sign. A built-on-site flat avoids this, but takes longer on your property.

Questions to ask either type of builder

  • Will you put in writing that the building and work meet all legal requirements?
  • Who applies for the building permit, and who is named as the builder?
  • What exactly is included: footings, connection to services, stormwater, steps, delivery and crane?
  • What does the home indemnity insurance cover?

For more on picking a builder, read choosing a granny flat builder. To check the size limit, use the 70 m² calculator.

Sources

Questions

Common questions

Do transportable granny flats need council approval in WA?

Yes. They need a building permit like any granny flat. Planning approval isn't needed if the flat meets the deemed-to-comply rules, including being 70 m² or less.

Are DIY granny flat kits permit-free in WA?

No. Building and Energy and Consumer Protection have warned that DIY and permit-free claims may be misleading. There are no special exemptions for prefabricated buildings.

Do I need a registered builder for a transportable granny flat?

Yes, if it needs a building permit and is worth over $20,000, unless you're an approved owner-builder.

How should I pay for a transportable granny flat?

Consumer Protection recommends a small deposit, then progress payments linked to stages like materials delivery, manufacturing and installation, with proof each stage is done.

Is a transportable or built-on-site granny flat easier to approve?

Neither. The planning and building rules are the same. The differences are in how it's built, paid for and delivered.

A granny flat is a big project. The paperwork shouldn't be.

We check the 70 m² rules, line up the drawings and engineering, and lodge with your council. You get one point of contact from start to permit.

P.S. Not sure you even need a permit? Ask anyway. If you don't, we'll tell you, and it costs nothing.

Get my priceCall