The main rules
- Size: up to 70 m², not counting open verandahs or carports. A bigger one needs a planning application.
- How many: one granny flat per property.
- Renting: allowed, including to people who aren't family.
- Subdividing: building a granny flat doesn't let you split the lot, unless the planning scheme already allows it.
- Attached or detached: it can be attached to, built into, or separate from the house.
Planning approval
For most homes you don't need planning approval if the granny flat meets every "deemed-to-comply" rule in the R-Codes. Some zones still need it. If you're unsure, the City offers a deemed-to-comply check before you lodge your building permit. To vary the rules, you apply for development approval with good reasons, and neighbours may be asked. Check your zone and density with Planning Services on (08) 9231 0606.
Building permit: what to send
A building permit is always needed before work starts.
| BA2 (uncertified) | BA1 (certified) |
|---|---|
| Site plan at 1:200 with setbacks, floor levels, north point and road reserves | Certificate of Design Compliance from a registered building surveyor |
| Floor plans, elevations and a cross-section at 1:100 | The plans listed in the certificate |
| Contour survey, electrical plan with smoke alarms, stormwater details | Home indemnity insurance |
| Signed engineer's details, soil report, energy report, termite details, specifications | Any other approvals needed |
| Home indemnity insurance | |
| City decides within 25 working days | City decides within 10 working days |
If the City asks for more information, you have 21 days to send it. Building it yourself over $20,000 needs owner-builder approval first. Check drainage easements with the City and Water Corporation before you design.
See granny flats with no planning approval, the building permit and granny flat setbacks.